What happened

The inert gas generator (IGG) system on a ship was running without any alarms during cargo operations. The ship was a new take-over and the IGG plant was used on four occasions before the incident without any problems.

The second engineer (2E) saw smoke coming from the IGG scrubber SW pump starter panel in the ECR and switched off the breaker. The chief engineer (CE) and electro technical assistant (ETA) started working on the IGG starter panel, which is directly connected to the 440 volts busbar.

The 2E and 4E managed to restore water supply to the IG scrubber using the fire and GS pump. However, they could not start the IGG either in manual or emergency mode. After several trials, the 2E came back to the ECR to report the situation to the CE.

The CE and ETA were attempting to replace the burnt breaker on the IGG scrubber pump starter with one removed from the main seawater pump. Suddenly there was an electric flash / short circuit resulting in burn injuries to the CE, 2E and ETA.

IGG scrubber SW pump starter panel
Main Switchboard of a ship.

Consequences

  • Burn injuries to chief engineer, second engineer and electro technical assistant
  • Cost of medical treatment and repatriation
  • Inert gas system rendered out of service
  • Cost of spares and repairs
  • Cost of class attendance for occasional survey
  • Cost of crew change for joining replacement crew
  • Delays/off-hire

Causes

  • Failure to follow procedures.

- No RA made for the breakdown maintenance task.

- No work permit made for work on electrical circuits.

- Lock-out / tag-out procedures not followed.

  • Lack of risk perception / risk awareness.

- The CE failed to recognise the hazards of working on the live busbar (440 V). Company SMS prohibits work on live circuits.

- The CE considered PPE (high voltage gloves) alone as safe enough to work on the live circuit.

  • Inadequate work planning - chief engineer and ETA continued working on MSB starter panel in the ECR. Instead, they should have attempted to re-start the IGG manually with the back-up arrangement for water supply using the fire pump.
  • Inadequate inspection - the crew did not test the IGG operation on auxiliary selection using the fire pump since the take-over of the ship. There is no specific requirement for such tests in the current post takeover checklist FMM 01a.
  • Improper attempt to save time / effort - the crew was under self-imposed commercial pressure to avoid any cargo stoppage / delays. They did not contact the office for guidance or support.
  • Substandard act by external party (not under own control) - one bolt connecting the R-phase of busbar to the IGG SW pump breaker was found loose. The loose connection on MSB dropper busbar connecting link to the breaker base board indicated poor workmanship by the shipyard during installation. This may have been the cause of the initial smoking on the starter panel.

Lessons learnt

  • Always adhere to company procedures and permits to work system for all routine and non-routine / breakdown tasks.
  • Include testing of back-up equipment in FMM 01a – post takeover checklist. Try out all back-up arrangements of essential machineries post takeover and regularly thereafter familiarise concerned crew members adequately. (In this case, auxiliary selection tab on the IGG panel had to be pressed for three seconds, which was not known to the ship staff before the incident).
  • Do not come under self-inflicted commercial pressure and take short cuts to safety. Seek advice and support from the office when faced with difficult situations.
  • Encourage and promote STOP WORK card culture on board and ensure that power/distance issues do not come in the way of its use (between junior ranks/ratings and senior ranks).
  • Remember PPE is only the last barrier and more effective controls must be put in place before starting work to prevent accidents.

caution_warning_bsm_icon.gif

Warning: Company SMS prohibits work on live circuits. In this case, the system should have been isolated by black out and emergency generator taken on load.

RELATED BSM Insight

The potential of Carbon Capture and Storage for the shipping industry
The potential of Carbon Capture and Storage for the shipping industry

Carbon Capture and Storage (CCS) is a safe and efficient way to handle emissions and meet climate targets. And it offers beneficial opportunities for the shipping industry in gaining new business and reducing its own carbon footprint, Johan Lillieskold, Gas Solutions Specialist at Schulte Group, is convinced.

EU ETS: It's time to act
EU ETS: It's time to act

On 1 January 2024, shipping officially joined the European Union’s Emission Trading System (EU ETS). With it emerged a comprehensive set of responsibilities, accompanied by significant financial implications for shipping companies who, for the first time, are included in a market-based measure such as EU ETS. The increased level of interaction between the European Commission and the shipping industry means a novelty for both parties - and an ongoing learning process.

Unlocking operational synergies between yachting and commercial shipping
Unlocking operational synergies between yachting and commercial shipping

The superyacht industry has been developing significantly over the recent years, especially since 2020. Today, the total fleet worldwide is at 12,500 yachts over 24m seeing explorer yachts and multihulls growing in popularity and the attractiveness of very large yachts unbroken, despite other predictions. BSM Yachting has entered this market with an innovative approach.

Revolutionising seafarer training: breaking boundaries
Revolutionising seafarer training: breaking boundaries

Driven by the ever-evolving landscape of the shipping industry, BSM continuously updates the training programmes offered by its Maritime Training Centres (MTC), ensuring they remain at the forefront of industry standards. One example for this dynamic is the MTC’s response to the challenges of the global pandemic resulting in the development of not only highly specialised but also flexible and DNV-approved SIRE 2.0-related courses.

The next challenge in procurement
The next challenge in procurement

Founded in 2017 as a joint venture, GP General Procurement Company Limited (GenPro) is an independent procurement company. GenPro's objective is to negotiate framework supply agreements with international ship suppliers, ensuring BSM’s customers benefit from optimal prices for maritime products and services worldwide. In addition, the company actively advocates for the establishment of more sustainable supply chains.

Nourishing the body and soul of seafarers
Nourishing the body and soul of seafarers

The role of food onboard commercial vessels has always been an essential aspect of seafarers' lives. Throughout the years, there have been significant changes in the requirements and standards related to food onboard commercial vessels, particularly in terms of hygiene, food quality and the importance placed on these aspects for seafarers. For 30 years, Seachef Hospitality Services has been providing catering and hospitality services in the maritime world. Time to look back.

BSM is ready to go for EU ETS
BSM is ready to go for EU ETS

Carbon Compliance Management

There are only a few days to go until EU’s Emission Trading System (EU ETS) kicks in for the shipping industry from 2024. Bernhard Schulte Shipmanagement (BSM) has developed a comprehensive range of carbon compliance and EU ETS management services designed to support owners and operators mastering the complex regulation requirements and to reduce their carbon footprint and related costs.